Skip to content

XtremePowered

Off Roading

  • Home
  • 2012 Trailduster
  • Electric Panel Install

Electric Panel Install

November 22, 2019November 22, 2019 Ryan
wiring installed on panel

Here is the installation of the panel behind the dashboard.

Firewall prep for electric panel
Firewall prep for panel installation.
panel mounted on firewall
Panel mounted on firewall
wiring installed on panel
ECM, relays and Switch Pro power block mounted on panel.
power panel close up
Dash covering electric panel
Dash set in place
2012 Trailduster Electrical

Post navigation

Electrical Panel
It Runs and Shifts

Related Posts

Switch Panel
Electrical Panel

Here is the new electrical panel. The ECU is being relocated inside the cab along with the fuse box and…

Gen 4 Ram 1500 frame chop
Frame Shortening

Here is the frame being shortened 32.5 inches. The stock wheelbase on the Trailduster is 106 inches.  The new frame…

Playing with new tools

Santa brought a plasma cutter! Brake pedal and steering column support cut out.     Inside, you can see where…

Categories

  • 2012 Ram
  • 2012 Trailduster
  • 400EX
  • AZOP
  • Electrical
  • Fitness
  • Omega
  • Parts
  • Racing
  • Sport
  • Trail Rides
  • TRX450R
  • Uncategorized

Archives

  • May 2020
  • November 2019
  • May 2019
  • April 2019
  • March 2019
  • January 2015
  • December 2014
  • November 2014
  • September 2014
  • May 2014
  • December 2013
  • January 2013
  • December 2012
  • September 2012
  • July 2012
  • May 2012
  • April 2012
  • March 2012
  • February 2012
  • January 2012
  • December 2011

Copyright © 2024 XtremePowered | Dazzling Blog by Ascendoor | Powered by WordPress.